Padel courts,
built in our factory.

Padel court manufacturing, custom finishes and project delivery support,
from China to your site.

Blue padel court with black steel framing, glass walls and angled light poles

Padel court families

Find the right padel court.

Four padel court families to match your project, from clubs and resorts to commercial developments.

Compare Padel Courts
Blue panoramic padel court with clear corner glass inside a covered playing venue
Panoramic padel court in a covered venue

TOURNAMENT-STYLE PADEL COURTS

WPT tournament padel courts.
Indoor or outdoor.

Choose the corner design for your players and spectators. We manufacture WPT-style padel courts for indoor halls, outdoor venues and covered clubs.

Classic

Four exposed 100 × 100 mm corner posts and a clearly defined steel frame.

Panoramic

Concealed corner connections and open glass views, with engineered structural support.

Explore WPT padel courts

COVERED PADEL / COURT + ROOF

Covered padel courts.
One coordinated plan.

Choose the padel enclosure and fixed or retractable roof together. Our factory coordinates the structure, clear height, lighting and drainage interfaces for your site.

Explore covered padel court packages
  • Five fixed and retractable roof configurations
  • Club, panoramic and WPT court combinations
  • Model drawings, protected packing and installation support
Already have a court? Explore roof options →
Freestanding Arch Canopy · product and colour visualizations

PROJECT SETTINGS

See padel courts in their setting.

Explore our outdoor padel courts and covered venues across the Americas, Europe, the Middle East, Asia and Africa.

Explore all project views

HEBEI MANUFACTURING BASE

The people and production behind your padel court.

Steel fabrication, finishing and export preparation come together at our Hebei factory. CourtSpan connects manufacturing capability with the practical details of your project.

Inside our padel court factory
Aerial view of the Hebei padel court factory and its production buildings
CourtSpan manufacturing base · Hebei, China
Production lines
8
Production equipment units
85
Warehouse area
3,000 m²
Production workshop area
12,000 m²

1,500 padel court sets annual production capacity

Explore the manufacturing process

Buy your padel court direct from the factory.

A direct connection from your project brief to the production floor, with a clear equipment scope and a team to contact after delivery.

  1. Direct technical communication

    Connect your project questions with the people preparing the drawings and manufacturing the components.

  2. Made around your brief

    Specify the padel court model, frame finish, turf, lighting and branding with our factory team.

  3. Production you can follow

    Connect the agreed specification with fabrication, inspection documents and identified packing.

  4. Support after delivery

    Reach the factory for installation guidance, replacement-part identification and five-year quality warranty support.

Fabricated rectangular steel sections with visible welded connections

Built from the details

Padel court quality
starts with the details.

Steelwork, glass, mesh, turf and lighting need to fit the same plan. We connect material choices with fabrication, packing and the way the court will be assembled.

Explore Manufacturing Process

PRODUCT DOCUMENTATION

The documents behind the specification.

Material inspections, roof-membrane reports and product documentation for your technical review.

Explore certificates & reports

Explore our material inspection reports, canopy design documents and membrane testing. Request a document pack for your product and destination.

Your project.
Your finishing touches.

Coordinate the frame finish, turf colour, lighting, padding and brand positions before the equipment schedule is signed off.

Explore OEM & ODM
Artificial turf colour samples in lime, dark blue, red, blue and green
Frame coloursTurf optionsLight-pole shapesNet & padding graphicsCanopy coordination
Orange entrance and net-post protective padding

Optional padel court accessories

Padel court protection. Your club identity.

Protect padel court entrances and net posts with fitted padding. Choose the coverage, colours and your club logo as an optional addition to the padel court package.

From the first drawing
to the final component.

Know what happens next, what comes with the equipment and what your local team prepares.

01

Define

Site, count and equipment brief.

02

Coordinate

Configuration and drawing interfaces.

03

Manufacture

The agreed equipment schedule.

04

Deliver

Packing, transport and unloading plan.

05

Assemble

Guidance for the local installation team.

06

Maintain

Component records and after-sales support.

Understand Project Delivery

THE COURTSPAN PRODUCT RANGE

One venue. More ways to play.

Explore our padel courts, roofs and sports equipment. Choose the structure, finish and features for your venue.

See what we manufacture

Different projects.
A clear way forward.

Start with the needs of your project team. We help organize the equipment and the information around them.

Explore Solutions
Vicky Zhang, Senior Project Manager at CourtSpan

YOUR PROJECT CONTACT

Meet Vicky Zhang.

Senior Project Manager · CourtSpan

Your point of contact for padel court selection, customisation, production coordination and overseas delivery support. A direct conversation helps turn your site information and commercial goals into a clear equipment brief.

A few useful answers.

Start here, then send the details that are specific to your site.

All Questions
What should I send for a first quotation?

Your country, city, court count and indoor, outdoor or covered use are enough to start. A sketch or photographs of the available space help us discuss an appropriate configuration.

Can I customize the court under my own brand?

Yes. Discuss frame and turf colours, branding positions, lighting and packaging requirements in the equipment brief. The final options are recorded with the agreed specification.

Does the court package include local construction?

Equipment supply and local works are defined separately. Foundations, drainage, approvals, electrical works and installation responsibilities should be allocated before the order is confirmed.

Can you help with installation planning?

Installation guidance and equipment information can support your local contractor. Confirm the documents, support arrangements and any on-site services in the quotation.

Packaging & shipping coordination
Installation guidance
Five-year quality warrantyCertificates & technical reports

YOUR NEXT STEP

Tell us what
you’re planning.

Start with your location, padel court count and the equipment you have in mind. Our factory team will help turn your brief into a clear proposal.

  • Padel court selection and custom finishes
  • Equipment scope, drawings and export packing
  • Canopy, installation and delivery coordination
Vicky ZhangSenior Project ManagerWhatsApp Vicky
Still planning the budget?
Try the padel court calculator

Your project starts here.

Fields marked * are required.

Contact and project details
Add drawings or a detailed brief →

Local preview: saved on this computer. No email or message is sent.

Request a QuoteWhatsApp